Back to all trades & templates
Built for MEP Estimators & GCs
Compare Division 26 Electrical Quotes Without Missing Gear, Controls, or Trenching
Audit switchgear lead times, lighting package allowances, fire alarm tie-ins, utility trenching, and low-voltage exclusions across competing EC bids.
Live Bid Leveling Workbench•Upload PDF quotes or paste subcontractor proposals
Drop up to 6 Subcontractor Bid PDFs here (or .txt / .csv quotes)
Server-side PDF parsing extracts scope & exclusions into the leveling box below (max 10 MB/file).
Trade Focus: Division 26 Electrical