BidLeveler AI
Back to all trades & templates
Built for MEP Estimators & GCs

Compare Division 26 Electrical Quotes Without Missing Gear, Controls, or Trenching

Audit switchgear lead times, lighting package allowances, fire alarm tie-ins, utility trenching, and low-voltage exclusions across competing EC bids.

Live Bid Leveling Workbench

Drop up to 6 Subcontractor Bid PDFs here (or .txt / .csv quotes)

Server-side PDF parsing extracts scope & exclusions into the leveling box below (max 10 MB/file).

Trade Focus: Division 26 Electrical